Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis sisa material dalam pekerjaan beton bertulang pada proyek konstruksi
Author
Belseran, Ivan Jansens
Additional Author(s)
Kempa, Meidy
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011773/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
REINFORCED CONCRETE CONSTRUCTION
Notes
Appendix: p. 108 - 122
Bibliography: p. 106 - 107
Abstract
-
Physical Dimension
Number of Page(s)
xv, 122 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00164/12
(T) 624.1834 Bel A
-
Unavailable : Removed
Similar Collection
by author or subject
Construction equipment policy
Reinforced concrete
Aplikasi material requirement planning untuk mengendalikan investasi pengadaan material pada PT. JHS Pilling System
Construction project scheduling and control
Studi tentang komponen-komponen yang terdapat dalam tahapan-tahapan pengembangan perumahan oleh PT."X" di makassar
Faktor-faktor kesuksesan proyek berdasarkan pendapat manajer proyek
Construction productivity management
Usulan implementasi sistem umpan balik360 derajat di perusahaaan konstruksi X