Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus kriteria pemilihan kontraktor saat proses prakualifikasi yang dilakukan pada kontraktor yang sudah ber-ISO 9000 di Surabaya
Author
Gunawan, Eric Alexander
Additional Author(s)
Wijono, Tony
Publisher
Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011800/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY
BUILDINGS-CONTRACTS AND SPECIFICATIONS
CONTRACTORS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
-
Dimension
-
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03628/11
(T) 692.8 Gun S
-
Unavailable : Removed
Similar Collection
by author or subject
Pandangan dan penerapan atribut-atribut dari prinsip constructability oleh kontraktor di Surabaya pada tahap pelaksanaan
Building information modeling (BIM) : teknologi, manfaat dan kendala dalam dunia konstruksi di Surabaya
Analisa pengaruh peran top manajemen, supplier relationship, strategi purchasing, dan supply chain integration terhadap performa purchasing pada perusahaan konstruksi
Efek material pengisi kalsium karbonat dan waste marble dust terhadap sifat mekanik mortar
Faktor penyebab, akibat, dan proses pengolahan change order pada proyek rumah tinggal di Surabaya
Pemakaian dinding panel pada proyek konstruksi di Indonesia
Quantitative methods in construction management
Faktor-faktor yang mempengaruhi pelaksanaan program K3 pada perusahaan kontraktor di Surabaya