Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Implementasi sistem kanban pada mechanical assembly drawer line di PT Schneider Electric Indonesia
Author
Jonatan, Ricardo Valentino
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021517/IND/2011
Subject(s)
PRODUCTION MANAGEMENT
Notes
Appendix : p. 46 - 59
Bibliography : p. 45
Abstract
-
Physical Dimension
Number of Page(s)
xi, 59 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02439/11
(T) 658.5 Jon I
-
Unavailable : Removed
Similar Collection
by author or subject
Optimizing factory performance
Analisa peranan inovasi proses terhadap produktivitas (studi kasus pada PT XYZ)
Penentuan umur mata pisau potong mesin extruder kecil dengan pendekatan simulasi di PT X
LKP: PT Cipta Indah jl. Rungkut Industri III/61 Surabaya
LKP : PT Conbat Surabaya
Upaya peningkatan output produksi PT. Spindo di gudang VII unit I
Improvement proses, screwing pada lini kaleng kopi di PT. Sinar Djaja Can
Penjadwalan job di PT X dengan metode hybrid genetic algorithm untuk meminimasi makespan