Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan produktivitas produk D16D di assembly line A PT Astra Otoparts divisi Adiwira Plastik
Author
Sihanabun, Adrian
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021442/IND/2010
Subject(s)
PLANT LAYOUT
PRODUCTION MANAGEMENT
PRODUCTION PLANNING
INDUSTRIAL PRODUCTIVITY
Notes
Bibliography : p. 50
Abstract
-
Physical Dimension
Number of Page(s)
xi, 50 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03823/10
(T) 658.5 Sih P
-
Unavailable : Removed
Similar Collection
by author or subject
Pengukuran, evaluasi dan perencanaan peningkatan produktivitas pada PT. "X"
Analisa pengendalian persediaan bahan baku untuk memperlancar proses produksi pada Perusahaan Tegel Dewasa di Madiun
Penjadwalan produksi flowshop dengan avolosionary algorithms untuk non unique jobs
Relokasi pabrik filter dengan mempertimbangkan perencanaan produksi filter di PT Nojorono Tobacco International
Manajemen operasi produksi
Perancangan flexible manpower production line di PT Astra Otoparts Tbk. divisi adiwira plastik
LKP : PT Wijaya Indonesia Makmur Bicycle Industries
Programmable controllers for factory automation