Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan lead time produksi panel low voltage menggunakan material replenishment di PT. Schneider Indonesia
Author
Santoso, Robert
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021424/IND/2010
Subject(s)
MATERIALS HANDLING
PRODUCTION PLANNING
Notes
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
x, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02054/10
(T) 658.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Implementasi module sales and distribution (sd) enterprice resource planning (erp) dengan mfg pro ver eb2 (qad) di unit cabang jakarta 1 dan service station jakarta 1 pt. akari indonesia
Perancangan sistem perencanaan produksi dan pengendalian persediaan di PT. XYZ
Perancangan sistem monitoring dan evaluasi di PT Surya Putra Barutama
Analisa sistem penjadwalan produksi di CV. Sinar Baja Elektric
Analisis pengukuran efisiensi mesin pada proses circular di PT "X" dengan menggunakan metode data envelopment analysis
Perancangan incoming material system departeman paku-seksi paku PT. Surabaya Wire
The lean design guidebook
Manufacturing planning systems