Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan lead time produksi panel low voltage menggunakan material replenishment di PT. Schneider Indonesia
Author
Santoso, Robert
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021424/IND/2010
Subject(s)
MATERIALS HANDLING
PRODUCTION PLANNING
Notes
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
x, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02054/10
(T) 658.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Mastering lean product development
Pengidentifikasian waste melalui value stream mapping dan upaya pengurangan waste pada Departemen PK PT X
Perancangan inventory bahan baku yang efisien dan tepat pada PT. X
Perencanaan ulang layout dan material handling di PT Smart Tbk. untuk meminimumkan waktu perpindahan
Perancangan sistem departemen PPC cat di PT. Interkraft
Perencanaan kebutuhan material dengan memperhatikan tingkat inflasi di PT Sumber Djaya Perkasa
Perancangan alat bantu dan usulan perbaikan sistem kerja departemen extruder di PT. Kertarajasa Raya Sidoarjo
Perancangan sistem perencanaan produksi dan pengendalian persediaan bahan baku di pt. sarana graha ideal