Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan lead time produksi panel low voltage menggunakan material replenishment di PT. Schneider Indonesia
Author
Santoso, Robert
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021424/IND/2010
Subject(s)
MATERIALS HANDLING
PRODUCTION PLANNING
Notes
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
x, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02054/10
(T) 658.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penjadwalan produksi flowshop dengan avolosionary algorithms untuk non unique jobs
Perancangan sistem perencanaan dan pengendalian produksi di CV. Olympic Makmur Jaya
Pengurangan setup dalam usaha pengoptimalan investasi
Pengoptimalan rute dan jadwal kendaraan di PT. X
Penjadualan produksi ubin keramik single firing di PT Asia Victory Industri Ltd.
Perancangan tata letak fasilitas melalui pendekatan simulasi di PT Sakata Angkasa
Analisis pengukuran efisiensi mesin pada proses circular di PT "X" dengan menggunakan metode data envelopment analysis
Perencanaan produksi agregat dengan model liniear programming dan perencanaan kebutuhan bahan baku di PT. Irama Tembang Elok