Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan proses pada line assembly switch menggunakan metode video-analysis di PT Schneider Electric Ltd.
Author
Wibisono, Stephanus
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041355/IND/2009
Subject(s)
PRODUCTION MANAGEMENT
MANUFACTURING PROCESSES
PRODUCTION ENGINEERING
Notes
Appendix : p. 36 - 84
Bibliography : p. 35
Abstract
-
Physical Dimension
Number of Page(s)
xi, 84 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03726/09
(T) 658.5 Wib P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengukuran, pengevaluasian, dan perencanaan perbaikan produktivitas di PT. Multiplast Jaya Tatamandiri
Advances in manufacturing
Materials processing
Studi tentang pengukuran kinerja proses dan evaluasi inventasi in-mould-closing-device
Upaya peningkatan produktivitas dengan pengukuran kapasitas dan perancangan layout di PT FSCM Manufacturing Indonesia divisi kabel
Rekayasa mutu pada proses pembuatan arang dengan menggunakan metode taguchi
LKP : PT Wijaya Indonesia Makmur Bicycle Industries Surabaya
LKP : di PT Jaya Pari Steel Corp Ltd Surabaya