Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Effeciency improvement plan with kaizen methodology in pre-wiring and preparation station of SM6 line at PT Schneider Indonesia
Author
Limantoro, Roy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2008
Language
English
ISBN
-
Series
Tugas Akhir No.01011309/IND/2008
Subject(s)
MANUFACTURING PROCESSES
PRODUCTION PLANNING
INDUSTRIAL EFFICIENCY
INDUSTRIAL MANAGEMENT
Notes
Appendix: p. 67 - 112
Bibliography: p. 66
Abstract
-
Physical Dimension
Number of Page(s)
xii, 112 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04875/08
(T) - 658.515 Lim E
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
"La Bella" fresh breads, cakes and cookies
Mastering lean product development
Penurunan waktu dandori dan standarisasi kerja di Plant PI-GS area 7 dan 8 PT Astra Otoparts Divisi Adiwira Plastik
LKP : PT Barindo Anggun Industri Surabaya
Sistem perencanaan produksi dan kebutuhan material di PT X
Quality function deployment
Perencanaan produksi dan persediaan di PT. Tirta Bahagia
LKP : PT Agrindo Surabaya