Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi tentang koordinasi isolasi gardu induk outdoor 150 kv di Waru
Author
Octavio, Jie Ditto
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Elektro UK Petra , 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010584/ELK/2008
Subject(s)
ELECTRIC TRANSFORMERS
Notes
Appendix: p. 86 - 160
Bibliography: p. 85
Abstract
-
Physical Dimension
Number of Page(s)
xii, 160 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04648/08
(T) - 621.314 Oct S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Menurunkan tingkat arus harmonisa pada sistem tenaga listrik dengan kombinasi beban tak linear satu fasa dan tiga fasa
LKP : Perusahaan Umum Listrik Negara pembangkitan dan penyaluran Jawa bagian timur dan Bali sektor Surabaya transmisi Surabaya Timur Gardu Induk Sukolilo
Studi perbandingan pengaruh harmonisa tiga fasa yang menyebabkan ketidakseimbangan beban antara gardu trafo tiang 200 kVA dengan 160 kVA di PLN APJ Surabaya Utara
Analisis pengaruh rendahnya faktor daya dan distorsi harmonik dari beban terhadap transformator 3 phasa 2,5 KVA 50 HZ
LKP : CV Trisula Sentra Persada
Perencanaan sistem penyaluran daya 40 MVA 150 KV proyek konsumen besar Petro Copper Smelter di daerah Gresik
LKP : CV Trisula Sentra Persada Surabaya
Studi perawatan dan perbaikan minyak trafo mineral