Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Implementasi group technology di PT X
Author
Slamet, Franky Kurniawan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Teknik Mesin Universitas Kristen Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010850/MES/2008
Subject(s)
PLANT LAYOUT
Notes
Appendix: p. 50 - 75
Bibliography: p. 49
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 75 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01015/08
(T) - 658.23 Sla I
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan ulang tata letak fasilitas PT. Steel Pipe Industry of Indonesia unit 1 gudang 3
Perancangan ulang tata letak fasilitas di PT Meco Inoxprima
LKP : evaluasi keseimbangan lintasan dan tata letak pabrik pada PT Paberik Pharmasi "Vita"
Usulan peningkatan kinerja karyawan pada departemen blow molding dan injection molding di PT. X menggunakan metode dilo
LKP : analisa perbaikan tata letak fasilitas produksi PT HM. Sampoerna Malang
Perancangan tata letak material berdasarkan pengendalian persediaan di PT Sumber Djaya Perkasa
Perancangan ulang tata letak fasilitas produksi dan analisa biaya produksi di PT Surya Sakti Utama
Analisa dan perancangan tata letak fasilitas PT. Steel Pipe Industry of Indonesia