Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan pengukuran kinerja staf dengan metode MBNQA modifikasi di perusahaan x
Author
Gunawan
Additional Author(s)
Wijaya, Okta
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.02011256/IND/2007
Subject(s)
TOTAL QUALITY MANAGEMENT
WORK MEASUREMENT
Notes
Appendix: p. 92 - 106
Bibliography: p. 91
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 106 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00764/08
(T) - 658.54 Gun P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Panggung Electric Corporation
Uji linieritas temperature transducer RTD (Pt-100)
LKP: Pembuatan program database untuk kontrol jumlah stok dan penjualan wooden toys
Mebel kayu lapis
Pendokumentasian work instruction dan standard operating procedure pada departemen produksi NCR dalam rangka persiapan awal penerapan ISO 9001:2000 serta penerapan SR di perusahaan "X"
Perancangan sistem manajemen mutu iso 9001:2000 di PT E-T-A Indonesia (Sidoarjo)
Perencanaan kebutuhan bahan baku pada perusahaan meja setrika
Perancangan pengukuran kinerja di rumah sakit jiwa Menur berdasarkan kriteria human resources focus, business process dan business result