Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor penyebab, akibat, dan proses pengolahan change order pada proyek rumah tinggal di Surabaya
Author
Murni, Imam Mustika
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000104/MTS/2007
Subject(s)
CONSTRUCTION INDUSTRY
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix: p. 127 - 154
Bibliography: p. 124 - 126
Abstract
-
Physical Dimension
Number of Page(s)
xv, 154 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03933/07
(T2) - 658.404 Mur F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
The Complete project management office handbook
Construction and applications of conformal maps
Studi contributory work and non-contributory work pada proses pekerjaan struktur salah satu perumahan di Surabaya Timur
Tingkat kepentingan dan alokasi resiko pada proyek konstruksi
LKP : Proyek Fountain Court Condominium
Legalitas redesign dan shop drawing oleh kontraktor
Alternatif studi kelayakan aspek keuangan proyek bot - studi kasus darmo trade center
Studi kelayakan pada hotel berbintang tiga di Surabaya dilihat dari aspek pasar dan aspek keuangan