Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa sistem perencanaan produksi di CV. Sinar Baja Electric
Author
Limantoro, Dewi Oktavia
Additional Author(s)
Rahardjo, Evan
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041219/IND/2007
Subject(s)
PRODUCTION MANAGEMENT
Notes
Appendix: p. 57 - 152
Bibliography: p. 56
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 152 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02996/07
(T) - 658.5 Lim A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa Penggunaan bahan baku filamen, faktor penyebab delay mesin lead in wire dan pembuatan rancangan sistem PPIC di PT. Cahaya Angkasa abadi sidoarjo
Analisa sistem maintenance dengan pendekatan hidden loss pada bottling line di PT. S
Penerapan value stream mapping dalam upaya mengurangi waste guna menurunkan lead time proses penerimaan barang jadi di PT X
Peningkatan output produksi dengan metode SMED di area busbar PT Schneider Electric Indonesia
Perancangan sistem persediaan bahan baku regular di PT E-T-A Indonesia
Pengoptimalan rute & jadwal rutin kendaraan di PT Gunung Arta Manunggal
LKP : Perusahaan Plastik PT Makmur Jaya Kharisma
Elements of production planning and control