Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Measure busbar and power assy time for low voltage line at PT. Schneider Electric Indonesia
Author
Permana, Hendra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
English
ISBN
-
Series
Tugas Akhir No.01041220/IND/2007
Subject(s)
MANUFACTURING PROCESS
PRODUCTION MANAGEMENT
Notes
Appendix: p. 42 - 139
Bibliography: p. 41
Abstract
-
Physical Dimension
Number of Page(s)
xii, 139 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01650/08
(T) - 658.5 Per M
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Operations management
LKP: perancangan sistem pengendalian persediaan di PT Dwi Sata Foam Jl. Simorejosari B3 Surabaya
LKP : positioning Matahari Departemen Store Plasa Tunjungan, pembandingan Plasa Tunjungan-Plasa Surabaya dan pembandingan Matahari Departemen Store-Galeria Matahari
Upaya penurunan downtime pada mesin double deck di PT X
Perancangan dan implementasi 5S di P.T. Ekasapta Hidupmaju
Perancangan dan penerapan 5S di area hand add PT Charoen Pokphand Indonesia Feedmill Balaraja
Implementasi metode quick changeover untuk meminimalkan waktu setup di P.T.Z
Identifikasi faktor-faktor motivasi yang mempengaruhi produktivitas kerja di PT Sari Warna Asli II Boyolali