Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan produktivitas tenaga kerja pada pekerjaan pembesian dengan metode level of effort (studi kasus pada proyek X dan Y)
Author
Gunardi, Allen Virtanius
Additional Author(s)
Wibowo, Lukas Hari
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121512/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Appendix: p. 59 - 111
Bibliography: p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 111 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00885/07
(T) - 658.314 Gun P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Value engineering project report
Studi kasus menganalisa waktu pekerjaan pengecoran kolom, balok, plat pada proyek Diparanu Rucitra apartemen lantai 10 dan 11
Perbandingan sisa material antara dinding bata konvensional dengan dinding bata ringan pada proyek perumahan
Studi pengaruh konsep multi customer terhadap kualitas di industri konstruksi
Studi tentang harga satuan upah pada proyek konstruksi
Construction management
Studi literatur tentang berbagai macam sertifikasi di dunia konstruksi
Analisa penjadwalan pekerjaan dinding pra-cetak