Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan produktivitas tenaga kerja pada pekerjaan pembesian dengan metode level of effort (studi kasus pada proyek X dan Y)
Author
Gunardi, Allen Virtanius
Additional Author(s)
Wibowo, Lukas Hari
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121512/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Appendix: p. 59 - 111
Bibliography: p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 111 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00885/07
(T) - 658.314 Gun P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Evaluasi kinerja bangunan dengan ketidakberaturan sudut dalam yang direncanakan secara direct displacement based design
Key Performance indicators (KPIs) yang digunakan untuk mengukur kesuksesan proyek konstruksi
Studi tentang penggunaan jasa asuransi pada proyek konstruksi di Surabaya
Analisis perencanaan dan pengendalian aliran kas untuk proyek konstruksi
Analisa pasar student apartment di Surabaya
Principles of construction management for engineers and managers
Faktor-faktor lapangan yang mempengaruhi produktivitas pekerja pada proyek konstruksi
Faktor-faktor yang mempengaruhi pemeliharaan ditinjau dari pengorganisasian tenaga kerja dan biaya pemeliharaan apartemen dan kondominium