Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan produktivitas tenaga kerja pada pekerjaan pembesian dengan metode level of effort (studi kasus pada proyek X dan Y)
Author
Gunardi, Allen Virtanius
Additional Author(s)
Wibowo, Lukas Hari
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121512/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Appendix: p. 59 - 111
Bibliography: p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 111 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00885/07
(T) - 658.314 Gun P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Principles of construction management for engineers and managers
Perbandingan produktivitas pekerjaan pasangan dinding bata ringan dan bata merah pada proyek perumahan di Surabaya
Faktor-faktor kesuksesan proyek berdasarkan pendapat manajer proyek
Analisa CPM dan bar-chart dengan menggunakan program microsoft project (Studi kasus bangunan kampus ITN 4 lantai di Malang)
Sistem perencanaan dan penjadwalan linear untuk proyek bangunan industri pergudangan
Analisa kendala pelaksanaan e-procurement di kota Surabaya
Pengaruh faktor jenis semen dan superplasticizer tipe polycarboxylate ether terhadap sifat-sifat mortar
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera