Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Maksimasi produksi aggregate plant dengan pendekatan matematis (studi kasus aggregate plant PT. Perwita Karya)
Author
Yulistyoputro, Edwin
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000090/MTS/2006
Subject(s)
MATHEMATICAL MODELS
PRODUCTION MANAGEMENT
Notes
Appendix: p. 70 - 166
Bibliography: p. 68 - 69
Abstract
-
Physical Dimension
Number of Page(s)
xi, 166 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
07451/06
(T2) - 658.503 Yul M
-
Unavailable : Removed
Similar Collection
by author or subject
Pengurangan lead time produksi mcset di PT. Schneider Indonesia
Analisis produktivitas kerja pada PT. Berkat Anugerah Raya
LKP : PT Baja Utama Danastri Surabaya
Perencanaan produksi dengan mempertimbangkan kapasitas produksi pada CV. X
The Manufacturing guides sustainable materials, processes and production
Analisa output produksi pipa GTE (Galvanized Threading End) pada proses threading di PT Spindo unit III
Agriculture as a metaphor for creativity in all human endeavors
Operations management