Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Maksimasi produksi aggregate plant dengan pendekatan matematis (studi kasus aggregate plant PT. Perwita Karya)
Author
Yulistyoputro, Edwin
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000090/MTS/2006
Subject(s)
MATHEMATICAL MODELS
PRODUCTION MANAGEMENT
Notes
Appendix: p. 70 - 166
Bibliography: p. 68 - 69
Abstract
-
Physical Dimension
Number of Page(s)
xi, 166 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
07451/06
(T2) - 658.503 Yul M
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan eksperimen bumbu rujak petis instan powder dengan metode Taguchi
Usulan pengurangan downtime mesin oil expeller PT. Sari Mas Permai
Perbaikan ergonomi untuk pekerjaan manual pada welding line di PT. Toyota Motor Manufacturing Indonesia
Analisis dan perancangan perbaikan sistem perencanaan produksi di PT. X
Perbaikan mutu proses pengisian air ke dalam botol di PT Tirtamas Megah
Characteristics of modern production
Upaya perbaikan proses pencatatan jumlah barang hasil produksi di PT. X
Pengendalian mutu pada proses produksi lampit rotan di perusahaan X