Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan heat recovery steam generation untuk mengkombinasi PLTG dengan PLTU PT. Indonesia Power unit Perak
Author
Arta, Pratama Wicaksana Budi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Teknik Mesin Universitas Kristen Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.02/0746/MES/2006
Subject(s)
ELECTRIC GENERATORS
Notes
Appendix: p. 79 - 105
Bibliography: p. 78
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 105 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
06362/06
(T) - 621.3121 Art P
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan mekanisme pembakit listrik tenaga bobot kendaraan
Studi tentang pmg dalam sistem aksitasi generator set daya 600 KVA di PT. Conductama Jerbindo
Power generation retrofitting
Studi teknis pengoperasian diesel genset (PLTD) 3800 KVA di PT. Meranti Sakti Indah Plywood, Samarinda
LKP : PT Agrindo
Study banding karakteristik self excited dan permanent magnet generator (PMG) yang diaplikasikan untuk generator 100 KVA dan 250 KVA
Dasar tenaga listrik
LKP : perencanaan dan pembuatan torsi meter untuk motor dengan daya 3 KW di Laboratorium Sistem Tenaga Listrik Universitas Kristen Petra