Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan heat recovery steam generation untuk mengkombinasi PLTG dengan PLTU PT. Indonesia Power unit Perak
Author
Arta, Pratama Wicaksana Budi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Teknik Mesin Universitas Kristen Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.02/0746/MES/2006
Subject(s)
ELECTRIC GENERATORS
Notes
Appendix: p. 79 - 105
Bibliography: p. 78
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 105 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
06362/06
(T) - 621.3121 Art P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : Sistematis perawatan generator 6,6 kV PLTA Selorejo
Studi tentang pengoperasian turbo generator 300 MW di PLTU Gresik
LKP : PT Maspion Group Surabaya
LKP : Pabrik Gula Kedawung PTP XXIV-XXV Pasuruan
Study banding karakteristik self excited dan permanent magnet generator (PMG) yang diaplikasikan untuk generator 100 KVA dan 250 KVA
Kontrol otomatis sistem listrik standby dan amergency pada satu genset 35 KVA, 380 V, 50 Hz, 3 phasa dengan menggunakan mikrocontroller 8031
Simulasi pembangkit listrik dengan penggerak motor magnet permanen
Studi suplai listrik dengan sistem pembangkit hibrida yang terdiri dari solar photovoltaic, wind turbine generator, diesel engine generator 200 KWH/hari tegangan 220 volt AC di Nusa Penida