Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Production scheduling using backward scheduling method in job shop system study case at Schneider Indonesia Ltd.
Author
Purnama, Candra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
English
ISBN
-
Series
Tugas Akhir No.10141083/IND/2006
Subject(s)
PRODUCTION PLANNING
SCHEDULING
Notes
Appendix: p. 86-101
Bibliography: p. 85
Abstract
-
Physical Dimension
Number of Page(s)
xv, 101 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05115/06
(T) - 658.53 Pur P
-
Unavailable : Removed
Similar Collection
by author or subject
Perbaikan sistem dokumentasi pada departemen quality assurance di PT FSCM Manufacturing Indonesia Plant 4
Perencanaan produksi dan pengendalian kualitas produk di pt. mulcindo steel industry
Perancangan keseimbangan lintasan di PT. Eben Haezer Surakarta
Sistem perencanaan produksi dan kebutuhan material di PT X
Sistem pengendalian stuffle, loss process dan finished product di departemen kawat-seksi drawing PT. Surabaya Wire
Analisis komponen kritis supply chain management terhadap performance perusahaan
Perencanaan produksi dan pengendalian persediaan di PT. Indoasia
Peningkatan sistem manajemen persediaan packaging box di PT X