Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan sistem gudang sub material dan spare part pada depatemen teknik PT Surabaya Wire
Author
Kartawiyasa, Irsan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041045/IND/2006
Subject(s)
WAREHOUSES-MANAGEMENT
PRODUCTION PLANNING
MATERIALS MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xi, 44 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01609/06
(T) - 658.785 Kar P
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan business process dan sistem standard operating procedure di PT. Zensei Indonesia
Pemilihan alternatif sistem penjadualan di PT Solihin Jaya
Perancangan sistem PPIC (production planning, inventory and control) produk flusher di PT. Surya Indomental Semesta
Perancangan sistem pengendalian bahan baku dan bahan penolong di omega plastics Sidoarjo
Perancangan sistem perencanaan produksi PT Daimaster
Penjadwalan produksi untuk meminimumkan setup time dan memaksimumkan aliran uang dengan metode genetic algorithm studi kasus pada CV. WP
Pemodelan kriteria-kriteria pemilihan tower crane pada proyek konstruksi
Perencanaan kebutuhan material di PT. Indogarmen