Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran kinerja perusahaan distributor kabel menggunakan metode balanced scorecard
Author
Kustiningrum, Wahyuni
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.02010929/IND/2005
Subject(s)
WORK MEASUREMENT
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 123 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00643/06
(T) - 658.542 Kus P
-
Unavailable : Removed
Similar Collection
by author or subject
Process improvement using mtm-uas analysis at switch assembly line in schneider electric Indonesia Ltd.
Perbaikan proses produksi bagian jahit melalui perancangan metode kerja dan keseimbangan lintasan di PT Angkasa Ria Indah Abadi
Peranan pengembangan produk dalam usaha meningkatkan volume penjualan pada Perusahaan XX di Surabaya
Minimization the occurences of NQP cubicle in sm6 assembly line at PT. Schneider Electric Indonesia
Perancangan alat ukur penilaian kinerja biro kepegawaian sebuah universitas dengan pendekatan balanced scorecard dan baldrige scoring
Upaya peningkatan efisiensi produksi di PT. X
Perencanaan peramalan dan penjadualan di PT Multi Global Makmur
Operations management