Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan bottleneck di PT. 'XYZ' dengan pendekatan simulasi
Author
Santoso, Andri
Additional Author(s)
Steven, Antonio Erik
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
No.01011008/IND/2005
Subject(s)
PRODUCTION CONTROL
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 85 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00550/06
(T) - 658.56 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : CV United Mesindo
Peningkatan produktivitas dengan metode lean manufacturing di PT. FSCM Manufacturing
Analisa prosedur dan penerapan sistem manajemen mutu standar ISO 9001 di PT Domusindo Perdana
Manajemen dan organisasi produksi
Perancangan pengendalian inventory system di PT X Surabaya
Perancangan sistem penilaian (scoring) operator borongan departemen kawat - bagian drawing PT. Surabaya Wire
Upaya penurunan tingkat kecacatan di PT. Rejeki
Perancangan sistem manajemen kualitas berdasarkan iso 9001:2000 di PT X di Surakarta