Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi perencanaan gardu induk baru new rungkut (sedati) 150 kv pln apj Surabaya Selatan
Author
Hermawan, David
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Elektro UK Petra , 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010509/ELK/2004
Subject(s)
ELECTRIC POWER TRANSMISSION
ELECTRIC POWER DISTRIBUTION
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xv, 112 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01821/05
(T) - 621.3191 Her S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Duta Graha Indah Contractor Surabaya
LKP : Jembatan Merah Plaza Surabaya
Transmission and distribution electrical engineering
Perencanaan saluran udara tegangan tinggi (SUTT) 150 KV Gilimanuk-Pemaron dalam rangka perbaikan sistem transmisi listrik di Bali
Perhitungan keandalan transmisi sutet 500 KV Paiton Garti terhadap sambaran petir dengan metode dua titik
LKP : PT PLN (Persero) distribusi Jawa Timur unit pengatur distribusi sistem Surabaya
Studi efek harmonisa akibat penggunaan lampu hemat energi (LHE) di rumah tinggal atau rumah toko (ruko)
Studi perbandingan penggunaan energi listrik antara suplai listrik dan generator set di PT. Industri Sandang Nusantara unit II Lawang