Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Process improvement of glost selection to despactch department pt. doulton
Author
Toendan, Maria Natalia M.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
English
ISBN
-
Series
Tugas Akhir No.04020919/IND/2005
Subject(s)
SCHEDULING
PRODUCTION PLANNING-QUALITY CONTROL
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
x, 108 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00832/05
(T) - 658.53 Toe P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Wijaya Indonesia Makmur Bicycle Jl. Raya Bambe Km 20 Driyorejo-Gresik
Scheduling theory, algorithms, and systems
Penjadwalan produksi dengan mempertimbangkan bottleneck di PT. Lestari Karya Makmur
Planning and managing interior projects
Pembandingan aplikasi metode penjadualan di perusahaan koper
Monitoring penjadwalan proyek dan evaluasi jumlah tower crane pada proyek condominium dan podium sebuah plaza di tengah kota
Penjadwalan pengiriman barang di PT Simplot Agritama menggunakan algoritma genetika
Analisa sistem penjadwalan produksi dengan kombinasi metode apparent tardiness cost with setups (ATCS) dan first come first serve (FCFS) pada PT. Surabaya Perdana Rotopack