Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas dan keterlambatan produksi tiang pancang dan tiang listrik pada perusahaan "X" dengan MPDM
Author
Lukito, Alvin Jayadinata
Additional Author(s)
Ardianto, Leonard Frans
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 021012117/SIP/2016
Subject(s)
COSTRUCTION INDUSTRY-MANAGEMENT
PILING (CIVIL ENGINEERING)
PILING
Notes
Appendix: p. 73-75
. Bibliography: p. 71-72 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 75 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02649/16
(T) SIP 2117
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Performance of deep foundation
Pengaruh pembebanan awal (preloading) pada pondasi pile raft terhadap daya dukung dan penurunannya
Pengaruh sudut "tapered pile" terhadap peningkatan daya dukungnya
Kapasitas pondasi tiang pada tanah lempung terhadap gaya lateral
Review of problems associated with the construction of cast in place concrete piles
Pengaruh pembebanan awal (preloading) pada pondasi tiang dan pile cap terhadap daya dukung dan penurunannya
Pengaruh penggalian terhadap beban lateral pada tiang pancang
Studi tentang masalah-masalah yang timbul sehubungan dengan pemakaian pondasi tiang pancang