Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan standar kerja untuk mengurangi lead time pengiriman dengan menggunakan metode value stream mapping di PT. Samando
Author
Wijaya, Michael Alexander
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021993/IND/2016
Subject(s)
DELIVERY OF GOODS
STANDARD OPERATING PROCEDURE
WORK MEASUREMENT
Notes
Appendix: p. 69-86
. Bibliography: p. 68.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 86 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02537/16
(T) IND 1993
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Tulus Tri Tunggal
Perancangan standard operating procedure (produksi, PPIC & administrasi produksi) di PT. X
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk.
Mudah menyusun SOP standard operating procedure
Perancangan sistem pada interior desain (studi kasus : scope interior)
Studi kelayakan perluasan pabrik rotan PT Bumi Rotan Jaya Mojosari
Identifikasi masalah pelaksanaan standard procedure, pengolahan data absensi, pengukuran workload dan jumalh staff yang dibutuhkan, dan analisa pengelompokkan karyawan harian pada PT "AH"
Analisa produktivitas tenaga kerja cacat dan normal di PT. Sinar Mulia Harapan