Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Estimasi penghematan biaya dan perancangan standarisasi kerja pada produksi air cleaner di PT. Astra Otoparts divisi adiwira plastik
Author
Saryadi, Richard Dwinata
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021792/IND/2015
Subject(s)
COSTS, INDUSTRIAL
PRODUCTION MANAGEMENT
Notes
Appendix: p. 82-115
. Bibliography: p. 81.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 115 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02648/15
(T) IND 1792
-
Unavailable : Removed
Similar Collection
by author or subject
Usulan improvement moulding plan di PT. X
Color styling
Resilience by teaming in supply chains and networks
Analisis tingkat rasio absensi dan keterlambatan terhadap pencapaian target produksi di PT Rimba Kencana, Banyuwangi
Analisis prinsip kerja 5S pada CV Kokoh Bersatu Plastik, Surabaya
The Manufacturing guides sustainable materials, processes and production
Operations and supply chain
Operations management