Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengaturan risiko hujan dalam kontrak serta dampak dan kendalanya pada proyek konstruksi
Author
Fendy
Additional Author(s)
Handoko, Joshua Reinaldo
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012017/SIP/2015
Subject(s)
CONSTRUCTION CONTRACTS
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-RISK MANAGEMENT
Notes
Appendix: p. 50-68
. Bibliography: p. 48-49.
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 68 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02619/15
(T) SIP 2017
-
Unavailable : Removed
Similar Collection
by author or subject
Tingkat kepentingan risiko dan respon risiko pada tahap pelaksanaan proyek kontruksi
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Survei mengenai biaya overhead serta faktor-faktor yang mempengaruhinya
Pengukuran dan pemetaan pekerjaan konstruksi
Studi kasus harga satuan upah dan bahan beton bertulang untuk proyek bangunan satu lantai
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (usafe condiition) terhadap kecelakaan kerja konstruksi
Analisa pengaruh strategic purchasing terhadap kinerja proyek melalui kemitraan, integrasi dengan pemasok dan kolaborasi pada perusahaan kontraktor utama di Surabaya
Monitoring penjadwalan proyek dan evaluasi jumlah tower crane pada proyek condominium dan podium sebuah plaza di tengah kota