Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan dan upaya peningkatan output rate di PT. X
Author
Soegiarto, Gary Limanto
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021825/IND/2015
Subject(s)
PRODUCTION MANAGEMENT
TIME MANAGEMENT
Notes
Appendix: p. 77-107
. Bibliography: p. 76.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 107 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02394/15
(T) IND 1825
-
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan jaminan kualitas di tool regrinding section PT. Toyota Motor Manufacturing Indonesia
Manajemen operasi
Advances in manufacturing
Penentuan umur mata pisau potong mesin extruder kecil dengan pendekatan simulasi di PT X
Analisis pemilihan pola produksi ekonomis untuk memenuhi rencana penjualan pada pabrik biskuit "MW" di Ujung Pandang
Pengurangan setup dalam usaha pengoptimalan investasi
Pengurangan loading time di PT. X menggunakan simulasi
Perancangan perubahan metode pergantian dies pada departemen kawat di PT Surabaya Wire