Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Improvement pada monthly manpower management untuk direct labor di PT. Toyota Motor Manufacturing Indonesia
Author
Wirahadi, Kevin Giovanni
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021817/IND/2015
Subject(s)
MANPOWER PLANNING
PERSONNEL MANAGEMENT
Notes
Appendix: p. 110-119
. Bibliography: p. 109.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 119 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02380/15
(T) IND 1817
-
Unavailable : Removed
Similar Collection
by author or subject
Peranan pelatihan dalam upaya peningkatan produktivitaskerja karyawan pada PT Wangta Agung I di Surabaya
Pengaruh budaya organisasional terhadap kinerja karyawan melalui self efficacy dan temperamen di PT. Nutrifood Surabaya
Studi kepuasan kerja dan keterlibatan kerja karyawan pada perusahaan persewaan mobil pt. ra
Organizational behaviour and human resource management
Analisa pengelolaan sumber daya manusia dan produktivitas karyawan (studi kasus pada PT. RedWood Interior, Surabaya)
Managing transitions
Pengaruh kepuasan kerja, motivasi kerja dan komitmen karyawan tetap pada kinerja karyawan tetap hotel mercure Surabaya
Penerapan metode penugasan dalam rangka mengoptimalkan biaya kerja di bengkel New Era Surabaya