Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Mengenal dan memahami proses operasi PLTGU : pengalaman dari Gresik
Author
Susanto, Hari
Additional Author(s)
Durrijal, Hadid
Semesta, Lentera
Publisher
Jakarta: Lintang Pancar Semesta, 2009
Language
Indonesian
ISBN
9789791520652
Series
Subject(s)
ELECTRIC POWER PLANTS
STEAM POWER PLANTS
GAS-TURBINES
ELECTRIC POWER SYSTEM
Notes
. .
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 122 p.
Dimension
23 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00154/15
621.312132 Sus M
Library - 7th Floor
Available
Similar Collection
by author or subject
Electrical power system design
Studi perencanaan pembangkit listrik tenaga diesel (PLTD) untuk kebutuhan energi listrik di kabupaten Alor
Electrical power equipment safety series
Studi pembangkit energi listrik dengan metode pendulum
High temperature alloys for gas turbines
Modifikasi high pressure feed water heater 7 di pembangkit listrik tenaga uap Paiton
Studi perencanaan instalasi dan distribusi tenaga listrik di sun city mall Sidoarjo
Pembangkit tenaga listrik