Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis kinerja waktu proyek sekolah "X" dengan metode performance intensity
Author
Santoso, Andrew
Additional Author(s)
Prasetyo, Andi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011914/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 162-174
. Bibliography : p. 161.
Abstract
-
Physical Dimension
Number of Page(s)
xxv, 174 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02576/13
(T) 658.924 San A
-
Unavailable : Removed
Similar Collection
by author or subject
Studi kasus mengenai aspek-aspek constructability pada suatu proyek apartemen
Analisis pengaruh variabel lokasi, produk, harga, promosi, pelayanan dan desain terhadap minat konsumen factory outlet di Surabaya
Analisa produktivitas pekerjaan pemancangan dan faktor-faktor yang mempengaruhinya dengan metode MPDM pada proyek X di Surabaya
Analisa percepatan durasi aktivitas sebagai antisipasi keterlambatan proyek
Construction scheduling
Studi implementasi sistem last planner pada proyek 'x' di Surabaya
Potensi penerapan pmbok untuk kepentingan manajemen konstruksi di Surabaya
Program simulasi perhitungan kinerja backhoe-dump truck pada pemindahan tanah mekanis