Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis kinerja waktu proyek sekolah "X" dengan metode performance intensity
Author
Santoso, Andrew
Additional Author(s)
Prasetyo, Andi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011914/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 162-174
. Bibliography : p. 161.
Abstract
-
Physical Dimension
Number of Page(s)
xxv, 174 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02576/13
(T) 658.924 San A
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh beberapa faktor budaya Bali terhadap motivasi kerja pekerja konstruksi, dan perbedaannya pada beberapa proyek di Denpasar
Perencanaan site layout proyek konstruksi dengan menggunakan integrated cad-based model
Analisis biaya elemental untuk perencanaan biaya proyek hotel
Analisa CPM dan bar-chart dengan menggunakan program microsoft project (Studi kasus bangunan kampus ITN 4 lantai di Malang)
Hubungan antara proses kepemimpinan pelaksana proyek dengan ukuran produktivitas mandor pada mall di Surabaya
Faktor-faktor yang mempengaruhi kinerja (performance) sumber daya manusia di tingkat menengah (mid level) manajemen pada perusahaan jasa konstruksi di Surabaya
Manajemen konstruksi
Studi aspek material konstruksi pada tahap perencanan dan pelaksanaan konstruksi