Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis kinerja waktu proyek sekolah "X" dengan metode performance intensity
Author
Santoso, Andrew
Additional Author(s)
Prasetyo, Andi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011914/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 162-174
. Bibliography : p. 161.
Abstract
-
Physical Dimension
Number of Page(s)
xxv, 174 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02576/13
(T) 658.924 San A
-
Unavailable : Removed
Similar Collection
by author or subject
Contractor's management handbook
Studi kasus perbandingan berbagai bata ringan dari segi material biaya, dan produktivitas
Analisis faktor-faktor yang dipertimbangkan konsumen dalam memilih lokasi perumahan menengah di Denpasar dan Kabupaten Badung, Bali
Hubungan antara taktik dan hasil negosiasi dalam penyelesaian sengketa jasa konstruksi
Identifikasi dan alokasi risiko-risiko pada proyek jembatan nasional Suramadu
Inspeksi fabrikasi dan ereksi pada konstruksi baja proyek gedung P1-P2 UK Petra Surabaya
CPM in construction management
Sustainable living