| Raw materials assesment Indonesia- Author(s)
- Hill, Neville R.
- ISBN
- -
- Dimension
- 32 p. / 30 cm.
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00634/79 | 691.2 Hil R | - | Unavailable : Removed |
| |
| Application of structural clay products for housing- Author(s)
- Siddiq, Suwandojo
- ISBN
- -
- Dimension
- 52 p. / 29 cm.
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00633/79 | 691.4 Sid A | - | Available |
| |
| Development of a steam cured building material on the basis of laterite soils and lime- Author(s)
- Ringsholt, Thomas
- ISBN
- -
- Dimension
- vii, 124 p. / 30 cm.
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00632/79 | 691.2 Rin D | - | Unavailable : Removed |
| |
| Concrete quality requirements and acceptance testing according to PBI 1971- Author(s)
- Parka, Nyoman
- ISBN
- -
- Dimension
- 56 p. / 29 cm.
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00621/79 | 691.3 Par C | - | Available |
| |
| Comparison between the flameless burning process and traditional burning methods- Author(s)
- Sobek, F.
- ISBN
- -
- Dimension
- 5 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00620/79 | 691.3 Sob C | Library - 8th Floor | Available |
| |
| Improvement of the lime industry in Indonesia- Author(s)
- Ringsholt, T.
- ISBN
- -
- Dimension
- 9 p. / 30 cm.
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00619/79 | 691.3 Rin I | - | Available |
| |
| The pfefferkorn test as a tool for the evaluation of clays- Author(s)
- Dirks, Fritz J.H.
- ISBN
- -
- Dimension
- 8 p. / 30 cm.
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00624/79 | 691.3 Dir P | - | Available |
| |
| Factors in the selection of a site for a factory for building material production- Author(s)
- Hill, Neville R.
- ISBN
- -
- Dimension
- 8 p. / 30 cm.
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00623/79 | 691.3 Hil F | - | Available |
| |
| Tata cara rencana pembuatan campuran beton ringan dengan agregat ringan- Author(s)
- Indonesia. Departemen Pekerjaan Umum
- ISBN
- -
- Dimension
- i, 29 p. / 30
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00555/94 | 691.3 Ind T/rb | Library - 6th Floor | Available |
| |
| Tata cara perhitungan harga satuan pekerjaan tanah untuk bangunan sederhana- Author(s)
- Indonesia. Departemen Pekerjaan Umum
- ISBN
- -
- Dimension
- iv, 12 p. / 30
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00279/96 | 692.5 Ind T/ph | Library - 6th Floor | Available | | 2. | 00533/94 | 692.5 Ind T/ph | Library - 6th Floor | Available |
| |
| Tata cara perhitungan harga satuan pekerjaan pondasi batu belah untuk bangunan sederhana- Author(s)
- Indonesia. Departemen Pekerjaan Umum
- ISBN
- -
- Dimension
- iv, 10 p. / 30
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00534/94 | 690.1 Ind T/ph | Library - 6th Floor | Available |
| |
| Tata cara perhitungan harga satuan pekerjaan penutup langit-langit untuk bangunan rumah dan gedung- Author(s)
- Indonesia. Departemen Pekerjaan Umum
- ISBN
- -
- Dimension
- i, 9 p. / 30
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00550/94 | 690.17 Ind T/ph | Library - 6th Floor | Available |
| |
| Tata cara perhitungan harga satuan pekerjaan kayu untuk bangunan rumah dan gedung- Author(s)
- Indonesia. Departemen Pekerjaan Umum
- ISBN
- -
- Dimension
- i, 14 p. / 30
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00556/94 | 692.5 Ind T/ph | Library - 6th Floor | Available |
| |
| Tata cara perhitungan harga satuan pekerjaan dinding tembok dan plesteran untuk bangunan sederhana- Author(s)
- Indonesia. Departemen Pekerjaan Umum
- ISBN
- -
- Dimension
- iv, 16 p. / 30
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00535/94 | 690.2 Ind T/ph | Library - 6th Floor | Available |
| |
| Tata cara perencanaan dinding struktur pasangan blok berongga bertulang untuk bangunan rumah dan gedung- Author(s)
- Indonesia. Departemen Pekerjaan Umum
- ISBN
- -
- Dimension
- i, 35 p. / 30
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00551/94 | 690.2 Ind T/pd | Library - 6th Floor | Available |
| |
| Tata cara perencanaan dan perancangan bangunan radiologi di rumah sakit- Author(s)
- Indonesia. Departemen Pekerjaan Umum indonesia. departemen pekerjaan umum
- ISBN
- -
- Dimension
- vi, 33 p. / 30
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00026/92 | 690.550212 Ind T | Library - 6th Floor | Available |
| |
| Tata cara perencanaan dan perancangan bangunan kedokteran nuklir di Rumah sakit- Author(s)
- Indonesia. Departemen Pekerjaan Umum indonesia. departemen pekerjaan umum
- ISBN
- -
- Dimension
- vi, 31 p. / 30
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00025/92 | 690.550212 Ind T | Library - 6th Floor | Available |
| |
| Tata cara perancangan penerangan alami siang hari untuk rumah dan gedung- Author(s)
- Indonesia. Departemen Pekerjaan Umum.
- ISBN
- -
- Dimension
- vii, 30 p. / 30
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00286/96 | 690.8370472 Ind T/pp | Library - 6th Floor | Available | | 2. | 00521/94 | 690.8370472 Ind T/pp | Library - 6th Floor | Available |
| |
| Tata cara pengecatan logam- Author(s)
- Indonesia. Departemen Pekerjaan Umum
- ISBN
- -
- Dimension
- vii, 9 p. / 30
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00537/94 | 698.1 Ind T/pl | Library - 6th Floor | Available |
| |
| Tata cara pengecatan genteng beton- Author(s)
- Indonesia. Departemen Pekerjaan Umum
- ISBN
- -
- Dimension
- vii, 10 p. / 30
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00539/94 | 691.4 Ind T/pg | Library - 6th Floor | Available |
| |