Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Prima prawn cracker factory
-
Creator(s)
(31498137) ROSALINE
(31498252) TEEDY SUSANTO WIJAYA
Contributor(s)
Pwee Leng → Advisor 1
Dewi Astuti → Examination Committee 1
Publisher
Universitas Kristen Petra; 2002
Language
Indonesian
Category
s1 – Undergraduate Thesis
Sub Category
Rancangan Usaha
Source
Rancangan usaha No. 147/EM/2002; Rosaline (31498137), Teedy Susanto Wijaya (31498252)
Subject(s)
FACTORY MANAGEMENT
PRODUCTION MANAGEMENT
File(s)
jiunkpe-is-s1-2002-31498137-47002-udang-cover.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-abstract_toc.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter1.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter2.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter3.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter4.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter5.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter6.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter7.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter8.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter9.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-conclusion.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-references.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-appendices.pdf
Similar Collection
by creator, contributor, or subject
Analisa fundamental sebagai alat bantu untuk memutuskan investasi di pasar modal : studi kasus pada industri perbankan yang go public tahun 1989 di PT Bursa Efek Surabaya
Pengaruh pengendalian proses dalam menentukan harga pokok penjualan di perusahaan kampas rem
Sistem perencanaan produksi dan kebutuhan material di PT X
Analysis on factors and criteria which influence PT XYZ in selecting non-nominated supplier
Manajemen bisnis dan pengembangan fungsi produksi/operasi bisnis garam beryodium pada perusahaan keluarga PT. Susanti Megah
Upaya penurunan tingkat kecacatan produk dengan metode DMAIC di PT X
Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam
Perancangan ulang lintasan produksi cell assembly connector 3P di PT Schneider Electric Manufacturing Batam menggunakan metode line architecture design methodology