Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Rencana anggaran biaya dan rencana kerja dan syarat-syarat proyek perkantoran
-
Creator(s)
(22391602) ESTER WIDYA WIRHASPATI
Contributor(s)
I Gusti Nyoman Sulendra → Advisor 1
Publisher
Universitas Kristen Petra; 1994
Language
Indonesian
Category
d3 – Diploma 3
Sub Category
Tugas Akhir
Source
Tugas Akhir No. 001/K.ARS/1-1/1994; Ester Widya Wirhaspati (22391602)
Subject(s)
BUILDING-ESTIMATES
OFFICE BUILDING
File(s)
jiunkpe-ns-d3-1994-22391 602-23452-kantor_baru-cover.pdf
jiunkpe-ns-d3-1994-22391 602-23452-kantor_baru-abstract_toc.pdf
jiunkpe-ns-d3-1994-22391 602-23452-kantor_baru-resource1.pdf
jiunkpe-is-d3-1994-22391602-23452-kantor_baru-extras1.pdf
Similar Collection
by creator, contributor, or subject
Balai sidang dan fasilitas pameran di Surabaya
Pusat olah raga perairan di Karang Kiring Gresik
Evaluasi sistem pengendalian biaya proyek pada perusahaan jasa konstruksi berskala besar di Surabaya
Studi awal activity based costing pada proyek konstruksi
Usulan sistem pengendalian biaya proyek (studi kasus kontraktor A, B dan C di Surabaya)
Kantor Bupati Kepala Daerah Tingkat II Pamekasan
Rasio kebutuhan beton, besi tulangan, dan bekisting untuk pekerjaan struktur pada proyek apartemen & hotel
Analisa biaya konstruksi berdasarkan SNI 2008 dan aplikasinya