Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengendalian kualitas pada proses produksi teakflooring di PT Spartawood, Sidoarjo
-
Creator(s)
(31493146) FIRSTLY SOPUTRA DJOJO
Contributor(s)
Hatane Semuel → Advisor 1
Hartono Subagio → Examination Committee 1
Publisher
Universitas Kristen Petra; 1997
Language
Indonesian
Category
s1 – Undergraduate Thesis
Sub Category
Skripsi/Undergraduate Thesis
Source
Skripsi No. 916/EM/1997; Firstly Soputra Djojo (31493146)
Subject(s)
QUALITY CONTROL
File(s)
jiunkpe-ns-s1-1997-31493146-14324-spartawood-cover.pdf
jiunkpe-ns-s1-1997-31493146-14324-spartawood-abstract_toc.pdf
jiunkpe-ns-s1-1997-31493146-14324-spartawood-chapter1.pdf
jiunkpe-ns-s1-1997-31493146-14324-spartawood-chapter2.pdf
jiunkpe-ns-s1-1997-31493146-14324-spartawood-chapter3.pdf
jiunkpe-ns-s1-1997-31493146-14324-spartawood-chapter4.pdf
jiunkpe-ns-s1-1997-31493146-14324-spartawood-conclusion.pdf
jiunkpe-ns-s1-1997-31493146-14324-spartawood-references.pdf
jiunkpe-ns-s1-1997-31493146-14324-spartawood-appendices.pdf
Similar Collection
by creator, contributor, or subject
Analisis kepuasan konsumen terhadap pelayanan dan fasilitas yang diperoleh di Perumahan Taman Permata Indah Sepanjang
Pengaruh penerapan customer relationship management terhadap loyalitas pelanggan pada UD. Sumaboyo di Surabaya
Peningkatan kualitas layanan stasiun radio 'SKFM' di kediri dengan metode servqual dan quality function deployment
Dampak penerapan ISO 9001:2000 terhadap kinerja karyawan dan kualitas makanan di Hongkong Noodle Restoran Surabaya
Penerapan fasilitas KITE di PT "X"
Penurunan reject rate penyok body pada proses assembly dengan metode DMAIC di PT XYZ
Implementasi CCC-r chart pada industri keramik di P.T. Platinum Ceramics Industry Ltd.
Pengukuran kinerja PT X dengan metode six sigma business scorecard